09:50 Keynote Address: All we Need to Know about Masonry Bridges
  • Masonry bridges have a long history and a long history of analysis, over 350 years, but this has been mostly simplistic
  • The structures are inevitably complex Even complex analyses are often based on crude approximations Bridges need to be classified before they can be analysed
  • Asking young engineers to inspect or analyse masonry bridges without proper training is unprofessional
Bill Harvey
Director, Bill Harvey Associates Ltd
and Visiting Professor, University of Exeter
10:15 The Government Perspective
Steve Berry
Head, Highways Maintenance Branch
Department for Transport
10:40 Structures Financial Toolkit
Speaker to be announced
11:05 Morning Refreshments and Exhibition Viewing
11:35 Bridge Inspector Training and Competence Project
Stephen Pottle
Structures Manager
Transport for London
12:00 Masonry Parapet Assessment
Brian Bell
Network Rail
12:30 Audience Question and Answer
12:40 Lunch and Exhibition Viewing
14:00 Afternoon Chair
Nick Appleyard
Editor
Surveyor
14:05 An Overview of the Olympic Park Infrastructure
Chris Hendy
Head of Bridge Design and Technology
Atkins
David Baird
Olympic Development Agency
14:30 National Bridge Stock Condition
Kevin Dentith
Principal Engineer, Bridge Maintenance
Devon County Council
14:55 Case Study:  Salford Quays -Media City Footbridge
Peter Curran
Director
Ramboll UK Ltd
15:20 Afternoon Refreshments and Exhibition Viewing
15:50 Risk Based Allocation of Maintenance Spend
Sharan Gill
Structures Engineer
TFL
16:15 Case Study: The Mersey Gateway - A Bridge to Prosperity
  • An overview of the project outlining the need for the crossing
  • The expected benefits T
  • The civil engineering challenges; form and reasoning of the "reference" design; and the procurement process.
Ian Draycott
Highway Authority Liaison Engineer
Mersey Gateway Project
16:40 Audience Question and Answer
16:50 Chair's Summary and Close of Day One
17:00 Bridges 2012: Home & Away Networking Drinks Reception

Day Two: Wednesday 28th March 2012

08:50 Registration, Refreshments and Exhibition Viewing
09:45 Morning Chair
Helena Russell
Editor
Bridge Design and Engineering
09:50 Forth Replacement Crossing - Specimen Design and Procurement Approach
  • Background to the project
  • Design Criteria including Eurocodes, Ship Impact, Wind Climate
  • Development of the Specimen Design
  • Approach to writing the Employer's Requirements
Steve Kite
Associate Director, Bridges
Arup
10:15 Forth Replacement Crossing - Winning Tender Design and Planning for Construction
  • Design options for optimal economical delivery
  • Construction sequence and programme
  • Construction methods
Carson Carney
Manager-Cable Stay Bridge Superstructure
American Bridge
10:40 Design & Construction of the Vidin-Calafat Bridge over the Danube River, Bulgaria- Romania
Vardaman Jones
Director, Project Delivery
High-Point Rendel
11:05 Morning Refreshments and Exhibition Viewing
11:35

New Materials Technology for Small and Medium-Span Bridges - Learning from the North American Lead

Dr. Lee Canning
Principal Engineer
FRP Bridges - Recent Developments and Opportunities

12:00 Cable Preservation and Monitoring Techniques - the Latest State of the Art
Charles Cocksedge
Technical Director, Transportation
Aecom
12:25 Audience Question and Answer
12:35 Lunch and Exhibition Viewing
14:00 Afternoon Chair
14:05 Bridge Design Competitions - Avoiding the Pitfalls?
  • Can design contests retain their relevance in a recession?
  • Examples of bridge competitions which have failed
  • Examples of bridge competitions which have worked well
  • The new best practice guidelines for bridge design competitions from IABSE
Brian Duguid
Associate
Mott MacDonald
14:30

Integral Design of Footbridges in the Benelux
Laurent Ney

CEO
Ney & Partners

14:55 Afternoon Refreshments and Exhibition Viewing
15:25 Footbridge Monitoring Project - Update on Progress so Far
Elena Barton
Research Scientist
National Physical Laboratory
15:50 Derry Peace Bridge Case Study
  • Design team response to client's aspirations for a "living landmark and lasting legacy".
  • Visual Concept of Bridge - how the bridge is uniquely designed to suit its specific context.
  • Structural Concept of the Bridge
  • Fabrication and Erection of the Bridge

James Marks
Associate
Wilkinson Eyre Architects

with Kandiah Kuhendran, AECOM & Philip Brown, Graham Construction

16:15 Audience Question and Answer
16:30 Chair's Closing Remarks and Close of Conference

© 2011, the Hemming Group Ltd, All Rights Reserved

Surveyor Events
Bridge Design & Engineering

GOLD SPONSOR

BASF - The Chemical Company

SILVER SPONSOR

SOFiSTiK